Brayman Construction Corporation, founded in 1947 as a specialty bridge contractor, continues to provided innovative design/build capabilities. The General Contracting Division of Brayman Construction Corporation provides comprehensive construction services on large complex civil infrastructure bridge projects for both public and private sector clients. We have successfully tackled almost every type of structure imaginable during our initial sixty years - from pre-cast spread box and I-Beam bridges to rolled steel and plate girder bridges as well as cast-in-place structures.
Value Engineering Concepts
Brayman Construction Corporation - recognized for their ability to provide innovative design/build solutions for complex projects, traditionally embraces value engineering concepts in numerous bridge design/build applications - providing significant savings in schedule durations and overall costs. |
| |
 |
 |
Mon 52-E
Through Value Engineering Practices - Brayman was able to generate a $1,033,660 Cost Savings for the client |
James Rumsey Bridge
Brayman Value-engineered a cantilever soldier pile wall into a permanent soil nail wall - providing significant savings to the state. |
Our Team Approach
Our efforts and significant recognition - including numerous awards, has been achieved through independent efforts, as well as through collaborative efforts wit other Brayman Divisions, contractors, world renowned engineering and design firms, and through successful joint venture endeavors.
Our unique and recognized bridge capabilities and experience includes critical and precision heavy lifting, barge/floating operations, steel erection, demolition, and numerous innovative foundation solutions - resulting in multiple projects being completed ahead of schedule and below budget expectations.
|
Diverse Foundation Solutions |
Brayman installed 176 total shafts for the foundation for the 40 span precast concrete segmental box girder bridge. |

Susquehanna River Bridge, Harrisburg PA
|
Heavy Lift Operational Capabilities |
Heavy lift operations accomplished from floating barge operations. |

James Rumsey Bridge, Shepardston WV
|
Demolition of Obsolete Structures
|
| Original bridge structure demolished upon completion of new bridge. |

East Brady Bridge, East Brady Pa
|
|
Leading edge design and construction practice:
Brayman embraces and incorporates leading edge design advancements such as cast-in-place cantilever construction - as utilized on the new Kanawha River Bridge project located in Charleston, West Virginia. Upon completion, the main span of this impressive structure will be the longest continuous segmental span in the United States. The “Cast in place” construction will incorporate the use of form travelers - a state of the art technique that will eliminate the need of a casting yard setup, as well as the need of lifting heavy segments into place.
|

Artists rendering of the Kanawha River Bridge |

Use of form traveler in similar application |
| Other Noteworthy Bridge Projects: |
|
|