Scope of Project:
This was a caisson foundation project for a new 6500 crypt mausoleum. Brayman drilled and installed 525 each, 24" caissons to depths up to 50’. Included in Brayman’s scope of work were the supply and fabrication of the reinforcing cages and spoils removal. Caisson installation was performed with the use of a track-mounted hydraulic caisson drill. |