Findlay Connector

Location: Findlay Township, PA
Owner: Pennsylvania Turnpike Commission
General Contractor: Dick Corp
Value: $2,199,050
Date Complete: September 2005

 


Scope of Project:

This project links the new southern beltway with the Pittsburgh International Airport. Brayman was contracted to perform 40,000 lf of driven H-piles for the bridge foundations; 2,000 lf of pre-drilling for the driven piles; 6,000 sf of temporary shoring; and 1,000 lf of 66” diameter drilled shafts for sign structure foundations.

 

 