Scope of Project:
This project links the new southern beltway with the Pittsburgh International Airport. Brayman was contracted to perform 40,000 lf of driven H-piles for the bridge foundations; 2,000 lf of pre-drilling for the driven piles; 6,000 sf of temporary shoring; and 1,000 lf of 66” diameter drilled shafts for sign structure foundations. |