UPMC East Load Test

Location: Monroeville, PA
Owner: UPMC
General Contractor: PJ Dick/Barton Malow
Value: $228,400
Date Complete: July 2009

 


Scope of Project:

Brayman Construction was contracted to perform two Osterberg load tests for a new 7-story University of Pittsburgh Medical Center (UPMC) hospital and parking garage located in Monroeville, Pennsylvania. The load tests were conducted in order to verify design parameters for the site development and building foundations.

 