Scope of Project:
We mobilized for this fast-track contract to install an approximate 25,000 sf soil nail wall with 1,000 soil nails. After mobilizing, the GC determined that changes to the design were required to accommodate site conditions. After undergoing a redesign, we remobilized and completed the project on a time and material basis. Project was estimated to be $1.3 million and was completed under the budget for $1.1 million. |