Cardinal Power Station

Location: Brilliant, OH
Owner: American Electric Power
General Contractor: Black & Veatch Construction, Inc.
Value: $5,969,000
Date Complete: In Progress

 


Scope of Project:

The scope of work for this project consisted of constructing twelve (12) 20 foot diameter, two (2) 30 foot diameter, and three (3) 40 foot diameter sheet pile cells for a new barge unloading facility. This facility was part of the power station environmental compliance (FGD) project on the Ohio River, just south of Stuebenville, Ohio. In addition to the cell construction, Brayman’s contract included minor dredging, scour protection, access walkways, reinforced concrete cell caps, and E crane platforms.


 

Download Printable PDF File of this project

Back to Foundation Project List

 

 

 

 

 

 

 

 

 

 

 

 
 
©2010 Brayman Construction Corporation :: General and Specialty Geotechnical Contractors
:: 1000 John Roebling Way Saxonburg PA 16056 :: ph. 724.443.1533 :: fx. 724.443.8733 :: info@braymanconstruction.com
About Brayman :: Safety :: General Contracting Division :: Foundation Division :: Steel Erection :: Employment :: Project Map