Fort Martin

Location: Maidsville, WV
Owner: Allegheny Energy
General Contractor: Washington Group International
Value: $6,000,000
Date Complete: In Progress

 


Scope of Project:

Brayman is a subcontractor for Washington Group International and was contracted for the construction of
the new barge unloading and mooring facility, as well as excavation supports for a new 400 foot long limestone storage tunnel. This project is part of the EPA ordered regulations for Flue Gas Desulphurization. Specifi cally, the projects consists of the construction of 12 new river cells – two (2) each 45 foot diameter, one (1) each 30 foot diameter, and nine (9) each 20 foot diameter. The project also includes the installation of a steel platform and walkway.


Download Printable PDF File of this project

Back to Foundation Project List

 

 

 

 

 

 

 

 

 

 

 

 
 
©2010 Brayman Construction Corporation :: General and Specialty Geotechnical Contractors
:: 1000 John Roebling Way Saxonburg PA 16056 :: ph. 724.443.1533 :: fx. 724.443.8733 :: info@braymanconstruction.com
About Brayman :: Safety :: General Contracting Division :: Foundation Division :: Steel Erection :: Employment :: Project Map