Scope of Project:
Brayman installed 35,000 square feet of sheetpile retention system for a low-level radiation excavation project at the former Molyorp site. The project includes installation of 1,500 linear feet of sheetpile wall installed to bedrock surface with a stick-up of approximately 6 feet to act as a floodwall to prevent water from the adjacent creek from entering the site during flood events. The majority of the wall did not require anchors, but a 200 foot section includes 23 drilled anchors and a wale system.
|